NSW Office of Environment and Heritage

Project

2015 - NSW Office of Environment and Heritage - Royal Botanic Garden Sydney, NSW

Design, Construction, Delivery & Installation Liaison of the Master Greenhouse Control System c/w; - Climate Controls sensing Humidy & Temperature

  • Fan Controls with VSD's
  • Overall Digital Control System with Touch-Panel Operator Interface
  • Delivery to inner-city Sydney and location in place

Boral Timber – Kyogle Plant

Project

1999 - Present - Boral Timber - Kyogle Plant, NSW

Design, Construction, Programming/SCADA, Test and Commissioning of Electrical Systems c/w;

  • Allen-Bradley PLC Migration from SLC500 to CompactLogix on the Racker
  • Allen-Bradley Micrologix 1500 PLC upgrades and reprogramming on the Infeed
  • Allen-Bradley Micrologix 1500 PLC upgrades and reprogramming on the Grading System

CEFN Piggeries – Ellangowan

Project

2017 - Present - CEFN Piggeries - Ellangowan, Qld

Design, Construction, Installation, Test and Commissioning of extensive onsite infrastructure c/w;

  • 1 x 1250A Main Switchboard allowing BioGas Power Export to the Ergon Energy Network
  • 1 x 400A Main Switchboard allowing Solar Export to the Ergon Energy Network
  • 1 x 1000A Power Station Distribution Board allowing Biogas Generator Injection
  • 1 x 1000A Main Distribution Board with Sub-Metering, Generator Back-up & Load-Shed Controls
  • 1 x 1000A 350m Underground Submain Run of 13 x 150sqmm Conductors per Phase & Neutral
  • Private, Gross & Nett Metering Sytems to Clean Energy Council specifications

Casino Meatworks (NCMC) – Casino

Project

1999 - Present - Casino Meatworks (NCMC) - Casino, NSW

Design, Construction, Installation, Test and Commissioning of extensive onsite upgrades c/w;

  • 1 x 4000A Main Switchboard with Sub-Metering, Surge Protection and Power Factor Correction
  • 3 x 1250A Main Switchboards with Sub-Metering, Surge Protection and Power Factor Correction
  • Industrial LED Lighting in the Boiler House
  • Power Quality Analysis across site

Main Camp Tea Tree Oil – Bungawalbyn

Project

1999 - 2015 - Main Camp Tea Tree Oil - Bungawalbyn, NSW

Design, Classification, Construction, Project Management, Test and Commissioning of a Flammable Liquids (Cat 3) T-Tree Oil Distillation Plant c/w;

  • Automation of Processing, Storage, Pumping and Transport Systems
  • Schneider M340 PLC System - Allen-Bradley Variable Speed Drives
  • Extensive Pharmaceutical-Grade Process Controls on Level, Flow, Pressure, Weight
  • "Ex" Classification and Installation
  • Pneumatic Controls

Macadamia Processing Company – Lismore

Project

1999 - Present - Macadamia Processing Company - Lismore, NSW

Design, Construction, Project Management, Programming/SCADA, Test & Commissioning of major Factory Upgrades c/w;

  • 2 x Large Scale Drying Complexes with 40 x Fans, 20 x Conveyors, 1 x Boiler, 6 x VSD Controlled Pumps
  • 1 x 2000A MSB with Arc Fault Containment, Surge Protection, Sub-Metering and MCCB Distribution
  • Automated Conveyor System with SCADA and 200+ flow paths to Silos, Processing and Drying
  • Cascaded Emergency Stop Systems throughout the Plant
  • Networked Allen-Bradley PLC's & PC-Based SCADA across the site with Ethernet Controls

Gallintel Steel Mill – Coffs Harbour

Project

2016 - Present - NEPEAN - Gallintel Steel Mill - Coffs Harbour, NSW

Design, Construction, Delivery & Installation of Automation and Process Control Systems on Steel Roll-Formers c/w;

  • VSD Controls on Feed Speed
  • High-Speed Encoder controlled Flying Shears
  • Touch-panel Batch Controls - Trolley forward and return Automation
  • PLC based Controller with future Data package to the Office
  • Integration with a Yaskawa Robot

NSW Dept of Commerce

Project

2010 - NSW Dept of Commerce - Northern Region, NSW

Electrical Engineering Design and Inspection Services for Government Infrastructure and Buildings

Dept of Roads and Maritime Services

Project

2011 - NSW Dept of Roads and Maritime Services - Northern Region, NSW

Design, Construction, Programming/SCADA, Test & Commissioning of Tunnel Electrical Systems c/w;

  • Cudgen Tunnel and Kennedy Dr Underpass Automated Lighting Controls with Allen-Bradley PLC's
  • Tugun Tunnel Power Quality Analysis leading to later corrective Static Harmonic Filtration

Pacific Gold Macadamias – Bundaberg

Project

2007 - Present - Pacific Gold Macadamias - Bundaberg, Qld

Design, Construction, Programming/SCADA, Test and Commissioning of major Factory Upgrades c/w;

  • Large Scale Processing Plant with 50 x Fans, 25 x Conveyors, 1 x Boiler, 4 x VSD Controlled Pumps
  • 3 x Main DB's with networked Allen-Bradley PLC's, Preview Plus700 HMI's and MCCB Distribution
  • Automated Conveyor System with SCADA and 25+ flow paths to Silos, Processing and Drying
  • Cascaded Emergency Stop Systems throughout the Plant