Baiada Poultry – Qld Southern Downs, Farm Expansions Posted on November 5, 2024November 5, 2024 by cpsystems Project Baiada Poultry - Qld Southern Downs, Farm Expansions 2023 Scope of Works Design, Construction, Installation & Commissioning of 2 x new 630A Main Switchboards with dual Back-up Generator feature Training of Operators Submission of accurate As-Built CAD Drawings upon completion Certification to the Customer and Supply Authority
CEFN Piggeries – Ellangowan Posted on December 5, 2018November 5, 2024 by CPS_admin Project 2017 - Present - CEFN Piggeries - Ellangowan, Qld Design, Construction, Installation, Test and Commissioning of extensive onsite infrastructure c/w; 1 x 1250A Main Switchboard allowing BioGas Power Export to the Ergon Energy Network 1 x 400A Main Switchboard allowing Solar Export to the Ergon Energy Network 1 x 1000A Power Station Distribution Board allowing Biogas Generator Injection 1 x 1000A Main Distribution Board with Sub-Metering, Generator Back-up & Load-Shed Controls 1 x 1000A 350m Underground Submain Run of 13 x 150sqmm Conductors per Phase & Neutral Private, Gross & Nett Metering Sytems to Clean Energy Council specifications
PigCo Piggeries – Echuca Posted on December 5, 2018September 20, 2024 by CPS_admin Project 2017 - Present - PigCo Piggeries - Echuca, Vic Design, Construction, Installation, Test and Commissioning of extensive onsite infrastructure c/w; 1 x 1250A Main Switchboard allowing BioGas Power Export across Site 5 x 400A Main Distribution Boards for Site Reticulation Numerous Small Control Boards for Pumps, Feed Machinery and Ventilation Controls Private, Gross and Nett Metering Systems to Clean Energy Council specifications