2017 - Present - Norco Foods – Lismore Plant NSW
Design, Construction, Installation, Test and Commissioning of a 14-Tank Cream Storage Facility c/w;
- 28 x VSD controlled Pumps, Fans & Agitators
- 300 point Asi Comms System in 11 Loops on Valve Automation & extensive Digital I/O
- 28 point Profibus Sensor System on Temperature & Level
- 12 point Industrial Ethernet System on Density & Flow
- Allen-Bradley Contrologix PLC with remote Flex I/O Blocks in the Field