Byron Youth Hostel – Belongil Beach, New Infrastructure Posted on November 5, 2024November 5, 2024 by cpsystems Project Byron Youth Hostel - Belongil Beach, New Infrastructure, 2021 Scope of Works Design, Construction, Installation & Commissioning of 1 x new 400A Weatherproof Main Switchboard Submission of accurate As-Built CAD Drawings upon completion Certification to the Customer and Supply Authority
Baiada Poultry – Qld Southern Downs, Farm Expansions Posted on November 5, 2024November 5, 2024 by cpsystems Project Baiada Poultry - Qld Southern Downs, Farm Expansions 2023 Scope of Works Design, Construction, Installation & Commissioning of 2 x new 630A Main Switchboards with dual Back-up Generator feature Training of Operators Submission of accurate As-Built CAD Drawings upon completion Certification to the Customer and Supply Authority
Casino Christian School – Casino, School Electrical Expansions Posted on October 23, 2024November 5, 2024 by cpsystems Project Casino Christian School - Casino, School Electrical Expansions, 2023 Scope of Works Detailed assessment of existing aged Switchboard systems and generation of a Site Master Single Line Diagram Design, Construction, Installation & Commissioning of a new 400A Main Switchboard with automated Controls Design, Construction, Installation & Commissioning of a 3 x new 250A Main Distribution Boards Training of Operators Submission of accurate As-Built CAD Drawings upon completion Certification to the Customer and Supply Authority
Adventist Senior Living – Alstonville, Back-up Power Generation for Site Posted on October 23, 2024November 5, 2024 by cpsystems Project Adventist Senior Living - Alstonville, Back-up Power Generation for Site, 2023 Scope of Works Detailed assessment of existing aged Switchboard systems and generation of a cutover plan to integrate Back-up Power for Site Design, Construction, Installation & Commissioning of a new 250A Diesel Generator Design, Construction, Installation & Commissioning of an Automatic Transfer Switch into the Main Switch Room Training of Operators Submission of accurate As-Built CAD Drawings upon completion Certification to the Customer and Supply Authority
NSW Dept of Health – Lismore Hospital Linen Service Laundry Posted on October 18, 2024November 5, 2024 by cpsystems Project NSW Dept of Health - Lismore Hospital Linen Service Laundry 2024 Scope of Works Detailed assessment of existing aged Laundry Control systems and generation of a cutover plan to modernise Site Design, Construction, Installation & Commissioning of a new 630A Main Switchboard with Lightning Protection and Electronic Sub-metering Design, Construction, Installation & Commissioning of a 3 x 250A Main Distribution Boards Re-pair of the existing overhead Cable-Tray Systems and modifications to the Floor-pit coverage with custom-Aluminium panelling Training of Operators Submission of accurate As-Built CAD Drawings upon completion Certification to the Customer and Supply Authority
Ballina Shire Council – Waste Water Treatment Plant Posted on October 18, 2024October 23, 2024 by cpsystems Project Ballina Shire Council - Waste Water Treatment Plant 2021 Scope of Works Detailed assessment of existing aged Pump Control systems and generation of a cutover plan to modernise Site Design, Construction, Installation & Commissioning of a new 630A Motor Control Centre with PLC control and 110KW VSD's Training of Operators Submission of accurate As-Built CAD Drawings upon completion
NSW Office of Environment and Heritage Posted on December 13, 2018September 20, 2024 by CPS_admin Project 2015 - NSW Office of Environment and Heritage - Royal Botanic Garden Sydney, NSW Design, Construction, Delivery & Installation Liaison of the Master Greenhouse Control System c/w; - Climate Controls sensing Humidy & Temperature Fan Controls with VSD's Overall Digital Control System with Touch-Panel Operator Interface Delivery to inner-city Sydney and location in place
Boral Timber – Kyogle Plant Posted on December 5, 2018September 20, 2024 by CPS_admin Project 1999 - Present - Boral Timber - Kyogle Plant, NSW Design, Construction, Programming/SCADA, Test and Commissioning of Electrical Systems c/w; Allen-Bradley PLC Migration from SLC500 to CompactLogix on the Racker Allen-Bradley Micrologix 1500 PLC upgrades and reprogramming on the Infeed Allen-Bradley Micrologix 1500 PLC upgrades and reprogramming on the Grading System
CEFN Piggeries – Ellangowan Posted on December 5, 2018November 5, 2024 by CPS_admin Project 2017 - Present - CEFN Piggeries - Ellangowan, Qld Design, Construction, Installation, Test and Commissioning of extensive onsite infrastructure c/w; 1 x 1250A Main Switchboard allowing BioGas Power Export to the Ergon Energy Network 1 x 400A Main Switchboard allowing Solar Export to the Ergon Energy Network 1 x 1000A Power Station Distribution Board allowing Biogas Generator Injection 1 x 1000A Main Distribution Board with Sub-Metering, Generator Back-up & Load-Shed Controls 1 x 1000A 350m Underground Submain Run of 13 x 150sqmm Conductors per Phase & Neutral Private, Gross & Nett Metering Sytems to Clean Energy Council specifications
Casino Meatworks (NCMC) – Casino Posted on December 5, 2018September 20, 2024 by CPS_admin Project 1999 - Present - Casino Meatworks (NCMC) - Casino, NSW Design, Construction, Installation, Test and Commissioning of extensive onsite upgrades c/w; 1 x 4000A Main Switchboard with Sub-Metering, Surge Protection and Power Factor Correction 3 x 1250A Main Switchboards with Sub-Metering, Surge Protection and Power Factor Correction Industrial LED Lighting in the Boiler House Power Quality Analysis across site