CEFN Piggeries – Ellangowan

Project

2017 - Present - CEFN Piggeries - Ellangowan, Qld - $500K

Design, Construction, Installation, Test and Commissioning of extensive onsite infrastructure c/w;

  • 1 x 1250A Main Switchboard allowing BioGas Power Export to the Ergon Energy Network
  • 1 x 400A Main Switchboard allowing Solar Export to the Ergon Energy Network
  • 1 x 1000A Power Station Distribution Board allowing Biogas Generator Injection
  • 1 x 1000A Main Distribution Board with Sub-Metering, Generator Back-up & Load-Shed Controls
  • 1 x 1000A 350m Underground Submain Run of 13 x 150sqmm Conductors per Phase & Neutral
  • Private, Gross & Nett Metering Sytems to Clean Energy Council specifications

PigCo Piggeries – Echuca

Project

2017 - Present - PigCo Piggeries - Echuca, Vic - $175K

Design, Construction, Installation, Test and Commissioning of extensive onsite infrastructure c/w;

  • 1 x 1250A Main Switchboard allowing BioGas Power Export across Site
  • 5 x 400A Main Distribution Boards for Site Reticulation
  • Numerous Small Control Boards for Pumps, Feed Machinery and Ventilation Controls
  • Private, Gross and Nett Metering Systems to Clean Energy Council specifications