Project

1999 - 2015 - Main Camp Tea Tree Oil - Bungawalbyn, NSW - $100K

Design, Classification, Construction, Project Management, Test and Commissioning of a Flammable Liquids (Cat 3) T-Tree Oil Distillation Plant c/w;

  • Automation of Processing, Storage, Pumping and Transport Systems
  • Schneider M340 PLC System - Allen-Bradley Variable Speed Drives
  • Extensive Pharmaceutical-Grade Process Controls on Level, Flow, Pressure, Weight
  • "Ex" Classification and Installation
  • Pneumatic Controls
Posted in Automation & Control, Projects.